Huasun Xuancheng HJT Solar Cell Factory Achieves Milestone Monthly Production Output Exceeding Design Capacity

Share

The C4 Workshop at Huasun Xuancheng Solar Cell Factory has reached a significant milestone,achieving monthly outputs of 251.45MW in June and 252.36MW in July. These figures surpassed the initial designed capacity of 250MW per month, setting a new benchmark in the heterojunction (HJT) industry. This achievement marks the first instance in the photovoltaic industry where actual output of the HJT cells has exceeded the designed capacity.

The C4 Workshop of Huasun Energy Xuancheng HJT Cell Factory celebrates a significant breakthrough by reaching production output of 252.36MW in July 2024, surpassing the designed capacity of 250MW.

This remarkable achievement is a testament to the dedication and ingenuity of the entire C4 team at Huasun’s Xuancheng base. Guided by the leadership of the factory, departments of Technology, Equipment, Manufacturing, Quality, Operations, and Plant Affairs established a highly efficient and coordinated workflow. This seamless integration of processes led to significant enhancements in production efficiency and product quality. Particularly noteworthy was the improvement in the bottleneck CVD process, where the team collaborated to implement advanced automation strategies and meticulous control measures, resulting in a 10% capacity boost. This critical breakthrough significantly enhanced the overall efficiency of the production line.

Jimmy Xu, Chairman and CEO of Huasun Energy emphasized the need for the Xuancheng cell factory to use the current efficiency as a foundation, continuously promoting process optimization and innovating technical solutions to achieve even higher efficiency. Additionally, Xu highlighted the importance of exploring new auxiliary materials to continuously reduce costs and strive for industry-leading performance in all indicators.

This increase in production is not just a numerical leap but also reflects Huasun Xuancheng Cell Factorys precise understanding and proactive response to customer and market demands. Looking ahead, the factory will continue to uphold an innovation-driven development philosophy, consistently reaching new heights in HJT technology, and providing global customers with higher capacity and superior quality products. The team is expected to work together to create new capacity milestones and embrace a brighter future.