India could become the world’s second-largest solar manufacturer by 2026. It will also have a notable presence in all upstream components of PV production, such as cells, ingots/wafers, and polysilicon, according to a new report.
China’s GSL Energy has started selling two versions of its new battery inverter, with storage capacities of 10 kWh and 20 kWh. It says the devices have a maximum charging and discharging current of 80 A.
Both houses of the Australian parliament have approved plans to establish an AUD 15 billion ($10 billion) national reconstruction fund to support domestic manufacturing in future industries and reduce the nation’s dependence on imports.
Canada’s new policy plan mirrors the US Inflation Reduction Act (IRA), including two new input tax credits (ITCs) targeting clean energy and technology manufacturing that will remain at 30% through 2033, stepping down to 15% in 2034 before phasing out altogether after 2034.
The International Renewable Energy Agency (IRENA) explains how to optimally use its SolarCity Simulator, an open-access platform designed to help member countries to deploy PV systems at the municipal level.
The Solar Energy Industries Association’s (SEIA) latest white paper on solar and storage manufacturing includes an interactive map. It shows that momentum has started to build for a transformational expansion of domestic solar and storage manufacturing.
The Chinese inverter maker plans to build both new factories in China’s Zhejiang province.
The European Union is working on a draft proposal, which pv magazine has seen, that would require 85% of the components used in European wind farms – along with 60% of heat pumps, 85% of batteries, and 85% of electrolyzers – to be manufactured on the continent.
BayWa AG is strategically realigning BayWa re so it can sell its solar trade business. In the future, the subsidiary will focus on international projects as an independent power producer (IPP).
China’s Guangzhou Sanjing Electric (SAJ) has developed a new line of battery inverters in single-phase and three-phase configurations.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.