Jinko unveils 6.25 MWh battery

Share

From ESS News

JinkoSolar introduced its latest generation SunTera G3 battery energy storage system (BESS) at the 13th Energy Storage International Conference and Expo (ESIE2025) in Beijing last week.

Housed in a standard 20-foot container and engineered for compatibility with global markets, the SunTera G3 boasts a rated capacity of 6.251 MWh. With over 10,000 cycles of operational life and roundtrip efficiency exceeding 95%, the system is designed to maximize discharge output across its lifecycle. Certified to IP55 ingress protection and C5 anti-corrosion standards, it operates at altitudes of up to 4,000 meters and withstands harsh and complex environmental conditions with ease.

“Safety is the bottom line in energy storage, and our core design philosophy,” Wu Dianfeng, general manager of Jinko’s storage division, told ESS News. “Unlike electric vehicles, where safety concerns often stem from collisions, storage systems are grid-connected, requiring far more stringent attention to electrical safety.”

To continue reading, please visit our ESS News website.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Net metering policies see significant revision in states across the U.S.
21 April 2025 The recent 50 States of Solar report from NC Clean Energy Technology Center identifies three trends in state policy activities and the top five distri...