China’s CGN New Energy announces winning bidders in 10 GWh BESS tender

Share

From ESS News

Chinese independent power producer CGN New Energy has announced the results of its 2025 procurement for lithium iron phosphate (LFP) battery energy storage systems, which will be installed alongside solar and wind plants as well as standalone facilities.

CGN New Energy issued the tender announcement in late November 2024, and revealed the winning bidders this week. The procurement was divided into seven lots, with each one amounting to 1.5 GWh. Lots one to three were grid-forming systems totaling 4.5 GWh, while lots four to seven were grid-following systems totaling 6 GWh.

Haibosichuang, Nanrui Relay Protection and CRRC Zhuzhou Institute were shortlisted and pre-winning bids for lots 1-3 at CNY 0.533/Wh, CNY 0.558/Wh and CNY 0.519/Wh, respectively.

To continue reading, please visit our ESS News website.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Hidden devices found in Chinese-made inverters in the US, reports Reuters
14 May 2025 US officials are reassessing the risks posed by Chinese-made devices in renewable energy infrastructure according to news agency. Reuters cites two un...