From pv magazine India
NHPC., India’s largest hydropower developer, has declared the winners of a tender to set up 3 GW of interstate transmission system-connected solar projects across India.
The procurement exercise was oversubscribed, with bids from 15 developers. The final average price came in at INR 2.52 ($0.030)/kWh to INR 2.53/kWh.
Avaada secured 1 GW, Jakson won 400 MW, and Green Infra Wind Energy and Mahindra‘s Hazel Hybren unit each took 300 MW. Additional winners included Apraava Energy, Hinduja Renewable Energy, Sprng Energy, and Engie‘s Solairedirect Energy India subsidiary, all with 250 MW each.
In October, NHPC launched a tender to select developers to set up interstate transmission grid-connected renewables projects coupled with energy storage systems to supply 1.5 GW of firm, dispatchable renewables.
In June, the company signed a deal with state-owned Grid Corp. of Odisha (GRIDCO) to develop pumped storage and renewable energy projects in the Indian state of Odisha. This deal followed an earlier deal with the Maharashtra state government, under which it agreed to develop four pumped storage projects totaling 7,350 MW in Maharashtra.
NHPC is also exploring pumped storage projects in Andhra Pradesh, Jharkhand, Karnataka, and Madhya Pradesh.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.