India’s SECI tenders 100 MW floating solar plant

Share

From pv magazine India

SECI has launched a tender to build a 100 MW (AC) floating solar project at Getalsud Dam, Ranchi district, Jharkhand.

The contract will cover engineering, supply, construction, and commissioning of the floating solar project, along with 10 years of plant operation and maintenance. The project should be commissioned within 18 months of the signing of the contract.

SECI has already secured financing from the World Bank. Prospective bidders have until May 2 to submit their proposals.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Hidden devices found in Chinese-made inverters in the US, reports Reuters
14 May 2025 US officials are reassessing the risks posed by Chinese-made devices in renewable energy infrastructure according to news agency. Reuters cites two un...