US utility seeks proposal to build 500 MW of solar at a retiring coal plant

Share

From pv magazine USA

Xcel Energy said it wants to add around 500 MW of new large-scale solar generation near its coal-fired Sherco Power Plant in Minnesota.

The Minneapolis-based utility is accepting proposals from developers to build solar projects of at least 75 MW that interconnect to the existing infrastructure at the Sherco plant. Proposals will be accepted until 5 p.m. on Feb. 2.

The projects would create an estimated 25 permanent positions, pending approval by the Minnesota Public Utilities Commission.

Xcel said it expects the solar installations to be running by 2024, following the retirement of the first Sherco coal unit. Xcel plans to fully phase out all coal plants in Minnesota by 2030.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Daikin launches air-to-water heat pumps for single-family homes
16 December 2024 Daikin has released a line of residential heat pumps, using propane (R290) as the refrigerant, with outdoor unit dimensions of 1,122 mm x 1,330 mm x 6...