Engie commisions 140 MW Bhadla plant, signs 250 MW solar PPA in India

Share

On the inauguration of the 75 MW (100 MWp) Mirzapur solar PV plant on March 12, Isabelle Kocher, CEO of Engie, commented, “It is an honor to welcome President of France, Emmanuel Macron and Prime Minister of India, Narendra Modi to Mirzapur, one of our key assets in the country.”

Engie was awarded the Mirzapur solar project in May 2016 for a price of INR 4.43/kWh (~$0.068/kWh) and signed a 25-year power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) in June 2016.

Read the rest of the article on pv magazine India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solarwatt presents new residential battery
22 November 2024 German manufacturer Solarwatt says its new battery can be flexibly configured as an AC or DC system. It also features an emergency power function and...